Systems convergence for modern airport builds.

AirPort Nexus by Rhinovit Technology International delivers end-to-end network integration, system design, and deployment at airports worldwide.

40+Airports Deployed
99.9%System Uptime
20+Countries Served
15+yrTrack Record

Integrated airport technology,
delivered worldwide.

Three core disciplines that bring complex airport systems together — on time and on spec.

Four phases. Zero downtime.

A proven project lifecycle built for the complexity of airport environments.

Assessment

Survey existing infrastructure, interview stakeholders, and map every system dependency across the airport.

Architecture

Design converged network topologies, system schematics, and integration plans aligned to ICAO and local standards.

Deployment

Install, configure, and integrate all systems on-site — coordinating with construction teams and airport operations.

Commissioning

End-to-end testing, FAT/SAT certification, training, and handover to ensure full operational readiness at go-live.

Delivering systems convergence
at San Diego International Airport.

End-to-end technology integration across SAN's landmark $3.8 billion Terminal 1 redevelopment program.

Completed

Terminal 1 Parking Plaza

San Diego International Airport (SAN) · San Diego, CA

Technology systems integration for SAN's five-story, two-million sq ft Parking Plaza — delivered in two stages with 5,230 spaces. Scope included advanced parking guidance systems with real-time stall availability, CCTV and security coverage across all levels, intercom-equipped entry/exit kiosks, EV charging infrastructure, network backbone, BMS, and wayfinding displays with color-coded navigation cores and natural-lit lightwells. Achieved Parksmart Gold certification.

Network Integration System Design Security BMS Commissioning
5,230
Parking Spaces
2M
Sq Ft
185
EV Charging Ports
5
Levels
Completed

New Terminal 1 — Phase 1A

San Diego International Airport (SAN) · San Diego, CA

Full technology systems integration for the first phase of SAN's new Terminal 1 — a 940,000 sq ft facility with 19 gates, 13-lane security checkpoint, fully automated baggage handling, and SITA-powered common-use passenger processing. Delivered network infrastructure, FIDS, security and surveillance, BMS, paging, and all commissioning through Owner Acceptances and go-live in September 2025.

Network Integration System Design FIDS Security BMS Paging Commissioning
19
Gates
940K
Sq Ft
13
Security Lanes
2,000
Bags/Hr Peak
In Progress

New Terminal 1 — Phase 1B

San Diego International Airport (SAN) · San Diego, CA

Continuing the Terminal 1 program with 11 additional gates, expanded concessions, customer lounges, and airside infrastructure — built on the footprint of the demolished original terminal. Providing full technology systems integration, carrying forward the converged network architecture and system standards established in Phase 1A through completion in 2028.

Network Integration System Design FIDS Security BMS Paging Deployment
11
New Gates
30
Total Gates
$3.8B
Program Budget
2028
Target Completion